My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48810
DRMS
>
Back File Migration
>
Report
>
REP48810
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:36 AM
Creation date
11/27/2007 12:24:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Report
Doc Date
7/28/1989
Doc Name
1988 ANNUAL HYDROLOGIC REPORT
From
NEW CASTLE ENERGY CORP
To
MLRD
Annual Report Year
1988
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />NCEC-1988 Hydrology Rpt -1- July, 1989 <br />1.0 INTRODUCTION <br />1.1 Report Contents <br />New Castle Energy Corporation's (NCEC) 1988 Annual Hydrologic <br />Report contains information required by Permit Stipulation No. 3, <br />Coal Ridge No. 1 Mining and Reclamation Permit, File No. C-84-065. <br />The format of the various data tables have been changed from the <br />pre -1987 reports to facilitate more efficient numerical and <br />graphical manipulation of the data. However, for the most part, <br />the new format did not require re-entry of the data and the <br />content of the tables remain the same. This report also includes <br />a discussion of future monitoring plans, including the <br />establishment of various standardized sampling protocols and <br />quality assurance (QA) procedures. <br />1.2 Activities in 1988 <br />Since NCEC's temporary cessation of activity in spring of 1986, <br />there has not been any mining activity at the site. The partially <br />completed mine portals remained sealed during all of 1988. <br />Despite the shut down of operations, an attempt was made during <br />1988 to maintain the monitoring program on a monthly/quarterly <br />basis, for field parameters and lab analyses, respectively. <br />However, due to monetary constraints, monitoring was performed <br />New Castle Energy Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.