<br />V MOUNTAIN COAL COMPANY -WEST ELK MINE
<br />LOWER REFUSE PILE -MONITORING SURVEYS
<br /> SURVEY 25
<br />Point 04/92
<br />
<br />B1
<br />B2 N 404,250.98
<br /> E 1,446,643.62
<br /> EL 6,147.467
<br />83 N 404,288.07
<br /> E 1,448,550.53
<br /> EL 6,146.396
<br />84 N 404,320.92
<br /> E 1,448,456.49
<br /> EL 6,144.857
<br />BS N 404,350.68
<br /> E 1,448,361.01
<br /> EL 6,144.834
<br />86 N 404,376.76
<br />E 1,448,264.92
<br />EL 6,143.139
<br />B7 N 404,400.77
<br />E 1,446,766.74
<br />EL 6,141.552
<br />B6 N 404,417.18
<br />E 1,448,069.15
<br />EL 6,137.891
<br />89 N 404,433.67
<br />E 1,447,970.93
<br />EL 6,131.599
<br />870 N 404,449.38
<br />E 1,447,874.09
<br />EL 6,125.783
<br />B71 N 404,465.67
<br />E 7,447,775.74
<br />EL 6,117.95
<br />This point was destroyed by the ne
<br />SURVEY 26
<br />Point 08/92
<br />B1
<br />82 N 404,250.99
<br /> E 1,448,643.82
<br /> EL 6,147.530
<br />83 N 404,288.13
<br /> E 7,448,550.56
<br /> EL 6,146.439
<br />B4 N 404,320.95
<br /> E 1,448,456.52
<br /> EL 6,144.934
<br />BS N 404,350.69
<br /> E 1,448,361.02
<br /> EL 6,144.917
<br />B6 N 404,376.71
<br />E 1,446,264.90
<br />EL 6,143.275
<br />B7 N 404,400.74
<br />E 1,448,168.16
<br />EL 6,141.632
<br />B8 N 404,417.21
<br />E 1,448,069.16
<br />' EL 6,137.972
<br />i B9 N 404,433.66
<br />E 1,447,970.96
<br />EL 6,131.672
<br />810 N 404,449.40
<br />E 1,447,874.08
<br />EL 6,125.144
<br />871 N 404,465.68
<br />E 1,447,775.75
<br />EL 6,118.016
<br />v road construction during September,
<br />SURVEY 27
<br />Point 12/92
<br />Bt
<br />B2 N 404,250.97
<br /> E 1,448,643.82
<br /> EL 6,147.497
<br />B3 N 404,288.11
<br /> E 1,448,550.57
<br /> EL 6,146.412
<br />84 N 404,320.94
<br /> E 1,448,456.55
<br /> EL 6,144.979
<br />BS N 404,350.67
<br /> E 1,448,361.05
<br /> EL 6,144.866
<br />B6 N 404,376.66
<br />E 1,446,264.95
<br />EL 6,143.206
<br />B7 N 404,400.76
<br />E 1,448,166.20
<br />EL 6,141.634
<br />BB N 404,477.78
<br />E 1,448,069.19
<br />EL 6,137.954
<br />B9 N 404,433.64
<br />E 1,447,970.99
<br />EL 6,131.679
<br />870 N 404,449.42
<br />E 1,447,874.13
<br />EL 6,125.139
<br />811 N 404,465.67
<br />E 1,447,775.76
<br />EL 6,116.063
<br />1991, and will not be reset.
<br />SURVEY 28
<br />Point 03/93
<br />B1
<br />82 N 404,250.93
<br /> E 1,448,643.83
<br /> EL 6,147.567
<br />B3 N 404,288.08
<br /> E 1,448,550.58
<br /> EL 6,146.456
<br />84 N 404,320.92
<br /> E 1,448,456.54
<br /> EL 6,144.967
<br />BS N 404,350.68
<br /> E 1,448,360.99
<br /> EL 6,144.905
<br />B6 N 404,376.70
<br />E 1,448,264.92
<br />EL 6,143.214
<br />87 N 404,400.82
<br />E 1,448,168.07
<br />EL 6,141.651
<br />BB N 404,417.18
<br />E 1,448,069.13
<br />EL 6,137.97
<br />B9 N 404,433.67
<br />E 1,447,970.93
<br />EL 6,131.644
<br />B70 N 404,449.49
<br />E 1,447,874.12
<br />EL 6,125.226
<br />871 N 404,465.71
<br />E 1,447,775.76
<br />EL 6,778.023
<br />
|