Laserfiche WebLink
,~ <br />Memo to Jeff Clayton <br />Cyprus-Orchard Palley Waste Pile <br />page 2 <br />I recommend that we accept the report as prepared by CH2M Hill and submitted <br />by Cyprus-Orchard Palley Mining. The operator should be required to comply <br />with all the recommendations of the design engineer. Further, the operator <br />should be required to have a qualified registered professional engineer in <br />charge of the work. The engineer in responsible charge should prepare <br />inspection reports, including appropriate Proctor analyses and compaction test <br />results, to document compliance with the design engineer's recommendation. <br />Upon completion of the remedial fill placement and head-of-slope excavation, <br />the engineer in responsible charge should prepare a certification statement, <br />documenting that the work was completed in accordance witi~ the approved <br />remedial plan. It is important that the remedial work be completed prior to <br />the end of this construction season. In order to affect the entire task, it <br />will be necessary for the remedial project to commence without delay. <br />In light of the unfortunate anticipated entry of the Cyprus-Orchard Palley <br />Coal Mine into Temporary Cessation status, I recommend that completion of the <br />remedial treatment of the West Ridge Waste Pile be a condition of entry into <br />Temporary Cessation. <br />cc: Sue Mowry <br />