1
<br />According to C.R.S. 34-32-1 16(3), and C.R. . 3=3-3?.~-116(3)(x), on the :anniversary date of the permit each year,
<br />the operator shall submit a report and a map howing the extent of currem disturbances to affected land,
<br />reclamation accomplished to date and during he preceding year, new disturbances that are anticipated to occur
<br />during the upcoming year, and reclamation t at will be performed during the upcoming year. Please attach such
<br />a report and map to enclosed annual report fo (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written eport.)
<br />If your operation is subject to the provisions f Temporary Cessation as d~^fined in the Act and Rules, you must
<br />provide with the Annual Report [he followin information as required by Z CCR 407-], 407-4, and Rules
<br />1.13.7(1)(x):
<br />__ ____ (I)_ theYondition of the operation at
<br />(ii) what specific measures have
<br />performance standards and Envii
<br />approved application; and
<br />(iii) plans for resumption of mining
<br />Please provide the additional following
<br />time of cessation;
<br />and will be implemented to comply with reclamation,
<br />n[al Protection Plan requirements, if they are part of your
<br />with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR ~07-1, 407-4, and Rules 1.150), provide an updated statement
<br />regarding the sufficiency of the valu of the Financial Warranty, specifically:
<br />(I) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(x), provide an updated
<br />statement regarding the suffi iency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Beds of Trust, and security agreements, self-insurance, salvage
<br />credit, and firs[ priority liens on project related fixtures.
<br />(ii) Per the requirements of CCR 407-1, 407-4, and Rules 1.15(t)(b), permits secured with a
<br />Deed of Trust or a Security greemen[, the operator shall submit an update, by a qualified
<br />independent appraiser, iodic ting any changes in property value, and a statement summarizing
<br />any circumstances which m affect the adequacy of the Deed of Trust, or Security Agreement,
<br />and the value of [he proper[ subject to either of these instruments. _ _
<br />-- - ~ The report sFiall. also provide proof that there are no past-due property fazes.
<br />(iii) Per the requirements of CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, he operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified y a Certified Public Accountant, demonstrating that the
<br />Letter of Credit does not exc ed ten percent (1090) of [he bank's capital surplus accounts.
<br />(vi) Per the requirements o 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the c ndition, value, and location of all pledged fixtures
<br />and equipment.
<br />(b) Per [he requirements of 2 CCR 4 7-I, 407-4, and Rules 1.15(1)(c), all monitoring information
<br />required as part of the approved pe t application, to include the Environmental Protection Plan.
<br />(Please note that if you are not a Des gnated Ivtining Operation, you will not have an Environmental
<br />Protection Plan as part of your appro ed permit.)
<br />
|