My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48475
DRMS
>
Back File Migration
>
Report
>
REP48475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:11 AM
Creation date
11/27/2007 12:20:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
2/5/2004
Doc Name
4th Q 2003 Certifications of Waste Banks
From
Peak Project Management, LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fill tk7, December 30, 2003 <br />Page 2 <br />COV ER MATERIAL <br />As documented by previous inspection reports, cover placement, seeding and mulching occurred during the <br />second quarter 2002. <br />STRUCTURAL INTEGRITY <br />The entire excess spoil fill facility was examined for signs of failure and instability such as tension cracks, <br />ground movement, springs and seeps, and standing water. No indication of potential instability was <br />observed. <br />DOCUMENTATION ANll OTHER OBSERVATIONS <br />Seasonal precipitation has resulted in germination of the seed-mix broadcast during the third quarter 2002. <br />Vegetation density is light, but appears to bewide-spread across the fill area. No significant erosion was <br />noted. Established drainage appears to be functioning as designed. <br />CERTIFICATION <br />Inspection was conducted by Ronald G. Thompson, a qualified professional and MSHA certified inspector <br />of earth and rock-fill embankments and impoundments, under the direction of Mr. Charles McGlothlin, a <br />registered professional engineer licensed in the State of Colorado. <br />This into certify, to the best of my knowledge and belief, that fill No. 7 construction and placement, as <br />noted since the previous certification and as determined during this inspection and by discussions with mine <br />personnel, is in accordance with designs as proposed by CTL Thompson in their report dated April 27 and <br />amended July 27, 2001 and as approved by the Division of Minerals and Geology. <br />~r <br />` 't~~~ ~ r <br />i <br />Ronald G. Thompson Charles W. McGlothlin t/ ' <br />Inspector Professional Engineer <br />Inspections completed in compliance with Rule 409.IQ I)(h) must be submitted (o the Division within hvo weeks of completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.