Laserfiche WebLink
Third Party Oversight ii Water, Wasta & Land, Inc. <br />' San Luis Mine January 10, 1993 <br />' performance will be provided when confirmatory laboratory permeability tests ate completed. <br />Quality assurance test results for the installation of the synthetic liner were acceptable. <br />Installation of the drain pipes on top of the liner system and drain pipe spacing were adequate. <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />1 <br /> <br />1 <br />1 <br />1 <br />