|
Third Party Oversight 24 Water, Waste & Land, Inc.
<br />' San Luis Mine January 10, 1993
<br />Division of Minerals and Geology (DMG1, 19931. Letter to Ken A. Kluksdahl, BMRI,
<br />"Placement of Phase II Tailings, San Luis Project, File No. M-88-112," from Larry D.
<br />Oehler, November 4.
<br />1
<br />1
<br />
<br />1
<br />
<br />1
<br />1
<br />
<br />1
<br />
<br />
<br />
<br />1
<br />1
<br />1
<br />
<br />Division of Minerals and Geology (DMG), 1993m. Letter to Alana L. Scott, BMRI "Adequacy
<br />Review of Technical Revision TR-016, San Luis Project, File No. M-88.112," from Allen
<br />C. Sorenson, December 23.
<br />Steffen Robertson and Kirsten (U.S.), Inc. (SRK), 1989. "112 Permit Application Amendment,
<br />San Luis Project, Costilla County, Colorado," prepared for BMRI, September.
<br />Steffen Robertson and Kirsten (U.S.1, Inc. (SRKI, 1990. "San Luis Project Permit Amendment
<br />Adequacy Responses, M-88-112," prepared for BMRI, January 9.
<br />Steffen Robertson and Kirsten (U.S.I, Inc. (SRK), 1991. "San Luis Protect Tailings
<br />Impoundment Construction Report," prepared for BMRI, July.
<br />Steffen Robertson and Kirsten (U.S.), Inc. ISRK), 1993a. "San Luis Mine Phase II, Raise I
<br />Design Report," prepared for BMRI, July 13.
<br />Steffen Robertson and Kirsten (U.S.) Inc. (SRKI, 1993b. Letter to Alana Scott. BMRI, "San
<br />Luis Project Phase II Raise I Design Report," from David Hallman, July 2.8. Attached
<br />to BMRI, 1993c.
<br />Steffen Robertson and Kirsten (U.S.), Inc. (SRK), 1993c. "Construction Status, Report, San
<br />Luis Project Tailings Disposal Area, Phase II, Raise I," prepared for BMRI October 13.
<br />Steffen Robertson and Kirsten (U.S.1, Inc. (SRKI, 1993d. "Drainage Blanket/Liner Cover Layer
<br />Permeability," prepared for BMRI, October 27.
<br />Steffen Robertson and Kirsten IU.S.i, Inc. (SRKI, 1993e. "Cold Weather Construction
<br />Activities," prepared for BMRI, November 2.
<br />
<br />
|