Laserfiche WebLink
Third Party Oversight 24 Water, Waste & Land, Inc. <br />' San Luis Mine January 10, 1993 <br />Division of Minerals and Geology (DMG1, 19931. Letter to Ken A. Kluksdahl, BMRI, <br />"Placement of Phase II Tailings, San Luis Project, File No. M-88-112," from Larry D. <br />Oehler, November 4. <br />1 <br />1 <br /> <br />1 <br /> <br />1 <br />1 <br /> <br />1 <br /> <br /> <br /> <br />1 <br />1 <br />1 <br /> <br />Division of Minerals and Geology (DMG), 1993m. Letter to Alana L. Scott, BMRI "Adequacy <br />Review of Technical Revision TR-016, San Luis Project, File No. M-88.112," from Allen <br />C. Sorenson, December 23. <br />Steffen Robertson and Kirsten (U.S.), Inc. (SRK), 1989. "112 Permit Application Amendment, <br />San Luis Project, Costilla County, Colorado," prepared for BMRI, September. <br />Steffen Robertson and Kirsten (U.S.1, Inc. (SRKI, 1990. "San Luis Project Permit Amendment <br />Adequacy Responses, M-88-112," prepared for BMRI, January 9. <br />Steffen Robertson and Kirsten (U.S.I, Inc. (SRK), 1991. "San Luis Protect Tailings <br />Impoundment Construction Report," prepared for BMRI, July. <br />Steffen Robertson and Kirsten (U.S.), Inc. ISRK), 1993a. "San Luis Mine Phase II, Raise I <br />Design Report," prepared for BMRI, July 13. <br />Steffen Robertson and Kirsten (U.S.) Inc. (SRKI, 1993b. Letter to Alana Scott. BMRI, "San <br />Luis Project Phase II Raise I Design Report," from David Hallman, July 2.8. Attached <br />to BMRI, 1993c. <br />Steffen Robertson and Kirsten (U.S.), Inc. (SRK), 1993c. "Construction Status, Report, San <br />Luis Project Tailings Disposal Area, Phase II, Raise I," prepared for BMRI October 13. <br />Steffen Robertson and Kirsten (U.S.1, Inc. (SRKI, 1993d. "Drainage Blanket/Liner Cover Layer <br />Permeability," prepared for BMRI, October 27. <br />Steffen Robertson and Kirsten IU.S.i, Inc. (SRKI, 1993e. "Cold Weather Construction <br />Activities," prepared for BMRI, November 2. <br /> <br />