Laserfiche WebLink
._ <br />operation Por 11 weeks during the summer of 1979, planting seedlings, setting <br />up and monitoring our drip irrigation s~~stom, and evaluating performance of <br />our plantings since the spring of 1978. (also some prior to 1978). <br />Our overall succes rate for seedling transplants is Pair-- in the range of <br />oP 75°, :7e hope to get t' is vp to 85-90~ ~~ i*~nroved planting tecrniques and <br />utilization of our i^~proved ;watering ca~bilities, °sti~rtes Par 19°0 include <br />and increased number oP aPPected land acreage to 100 abres(Rmendment Attached), <br />Phase One v~ork will continue along the hangingsvall of the ore body and at the <br />+estcrn half oP Gillespie Hiil (6,A acres), Phase Two planting v~ill cownence <br />on Zinc Hill, (8 ,2 acres}, and Phase Three':'sintenance and replanting will con- <br />tinue on Gold and Gillespie Rills, (7,4 and 5,5 acros respectively), <br />g, S, Klco <br />~r~~~~wJ' °.. <br />quarry Supt, <br /> <br />