7. Warehouse #2, also known as the I,ongwall Warehouse was removed in 2005. The concrete <br />foundations were disposed of on-site at EP-2 as shown on Permit Map 15. The azea was graded <br />to final contow and seeded in 2003. Soil material was stockpiled adjacent to EP-2 to facilitate <br />reclamation. This material has been spread to blend with the existing topography and is ready for <br />seeding in 2006. <br />8. The following addition culverts were removed in 2006: C-4, C-]0, C-52, C-53, C-54, and C-62. <br />Reclamation Maintenance <br />1. Pond 8 was dewatered by pumping the water to pond 6. Clean-out of Pond 8 was started in mid- <br />July. Rains in late July and August prevented adequate sediment removal. The pond was again <br />dewatered and ready for clean-out by late December of 2005. Sediment removed from Pond 8 was <br />transported to the Development Waste Disposal Area (DWP) for Disposal. <br />2. Sediment was removed from Sediment Control Basins RDA-SE and RDA-SW returning these <br />basins to design capacity. The sediment was disposed of at the DWP. <br />3. Rip-rap in the RDA down-drains was repositioned to contain follows within the drainage channels. <br />4. Routine grading of roads and ditch clean-out. <br />5. Weed Control included limited hand spraying to control Canadian Thistle and Houndstongue. <br />Phase I Bond Release was requested reclaimed portions of the East and West Portals. <br />Please call me if you have any questions or require additional information. <br />SincgrelY, <br />Ronald G. Thompson <br />