Laserfiche WebLink
Percent Solids Of Residuals Longmont -Twenty-five percent total solids <br />Used For Application Betasso -Fifty percent total solids <br /> 63~d WTP -Eighty percent total solids <br /> Average percent total solids -fifty-three percent <br />Will The Residuals Be Yes, tem rv stock pile (less than two years) to create top soil <br />Stockpiled At The Site?: mixture.g area shall be managed to prevent movement or <br /> runoff from the area. (see attachment B, in the area under <br /> "Proposed Contotlrs" is a lame depression of appro}:. 2 acres to <br /> be used as stockpile and mixing area. This area will provide <br /> complete containment for the stockpile and mixing area <br />Manner Of Residuals Top soil mixture shall be applied to the sites by bulldozer or <br />Application: other heavy equipment <br />Manner OF Residuals Surface Application <br />Application: <br />Past Application Monitoring David Buckner, ESCO Associates, Inc. has been contracted to <br /> monitor and identify measures which remediate any detrimental <br /> impacts from application of water treatment plant -esiduals. <br />General Water Use And Location <br />Nearest Class I Recreational Reservoir: Marshall Reservoir 1,000 feet down-gradient <br /> from North site <br />Nearest Surface Body Of Water: Marshall Reservoir 1,000 feet down-gradient <br /> from North site <br />Use Of Surface Body Of Water: Agricultural irrigation and municil>af water <br /> supply <br />Nearest River, Stream, And/Or 1. Coal Creek on northern edge of south site <br />Irrigation Ditch: 2. One irrigation headgate on north edge of <br /> south site <br />Use Of River, Stream, And/Or 1. Agricultural irrigation and mun.cipal water <br />Irrigation Ditch: supply <br /> 2. Agricultural irrigation of property east of <br /> reclamation area <br />Page 4 . <br />