Laserfiche WebLink
2) Permanent flood control dike - between the overland <br />conveyor and the river (see Permanent Flood Control <br />Dike - TRO1, Volume 7). Located in SW SE Section <br />27, NW'~aNE < Section 34 and NE'~aNW , Section 39, <br />T.lOS., R.98W., 6PM. <br />Area - 2.75 acres <br />Date - Fall 1985 <br />3) South lease exploration - drill pads and access <br />roads to drill holes PCC-09 through PCC-10 (see <br />South Lease Exploration Plan - TR04, MR10 and MR11, <br />Volume 8). Located in Section 12 and 13, T.115., <br />R.98W., 6PM. <br />Area - Approximately 4 acres <br />Date - Fall 1985 <br />4) South lease exploration - drill pads and access <br />roads to drill holes PCC-O1 through PCC-03 and <br />access road from Colorado Ute powerline to PCC-09 <br />turnoff (see South Lease Exploration Plan - TR04, <br />MR10 and MR11, Volume 8) Located in Sections 11, <br />13 and 29, T.115., R.98W., 6PM and Section 1, <br />T.1S., R.2E., Ute PM. <br />Area - approximately 3 acres <br />Date - Spring 1986 <br />5) North Decline - Portal, water treatment and storage <br />areas (see TR-19). Located in the N'~ NE< Section <br />34 and the NW'~<NW< Section 35, T.lOS., R.98W., 6PM. <br />Area - 18.3 acres <br />Date - Fall 1992 <br />6) North Decline - treatment building, A1-substation <br />and powerline between Al and A-substations. <br />Located in E3sNE, and NE'~SE4 Section 34, T.lOS., <br />R.98W., 6PM. <br />Area - 0.1 acres <br />Date - Spring 1993 <br />7) NW Intake Portal - Backfill portal located in <br />NW'~sSIE < Section 34, T.lOS., R.98W., 6PM. <br />Area - 0.1 acres <br />Date - Summer 1993 <br />8) Cameo Refuse Disposal Area No. 1 - Covered benches 1, 2 <br />and 3. Located in the SE, Section 28,T.lOS., R.98W., <br />6PM. <br />Area - 9.6 acres <br />Page 2 <br />