Laserfiche WebLink
1 <br />s • <br />13.2 FACILITY ADDITIONS OR CAANGES <br />13.2.1 Advance Notice Required <br />13.2.2 Written Assessment Required <br />13.2.3 Increase in Impoundment Height <br />13.2.4 Arcgeological Assessment <br />13.2.5 Flood Plain Protection <br />13.3 PROCESSING REQUIREMENTS <br />13.3.1 PRODUCTION RATE <br />13.3.2 OPERATING PROCEDURES <br />13.3.2.1 Procedures Manual <br />13.3.2.2 Changes In Operating Procedures <br />13.3.2.2.1 Evaluation of Impact <br />13.3.2.2.2 Mitigation of Impact <br />13.3.2.3 Effluent and Waste Controls <br />13.3.2.3.1 Air Emissions <br />13.3.2.3.2 Liquid Discharge <br />13.3.2.4.3 Failure of Containment Equipment <br />13.3.2.4.4 Radioactive Sludges and Sediment Disposal <br />13.3.2.4.5 Facility Trash <br />13.3.3 COMPLIANCE WITH CRITERIA FOR OFF-SITE DOSE LIMITATIONS <br />13.3.4 IMPOUNDMENT OPERATION AND MONITORING <br />13.3.4.1 Supervision <br />13.3.4.2 Freeboard <br />13.3.4.3 Inspections <br />13.3.4.4 Maintenance <br />13.3.5 GENERAL PROJECT MAINTENANCE <br />13.3.6 SAFETY, SECURITY, FENCING, POSTING, AREA CONTROL, PROTECTIVE <br />CLOTHING <br />13.3.6.1 Responsibility <br />13.3.6.2 Fencing <br />13.3.6.3 Posting Exemption <br />13.3.6.4 Controlled Area Restrictions <br />13.3.6.5 Protective Clothing <br />13.3.7 TRANSFER OF MATERIALS <br />13.3.7.1 Transfer of Contaminated Items <br />13.4 INSPECTION AND MONITORING PROGRAM <br />13.4.1 RECORDS <br />13.4.2 DATA RANDLING <br />13.4.3 QUALITY ASSURANCE <br />13.4.4 EQUIPMENT AVAILABLE <br />13.4.5 CALIBRATION OF EQUIPMENT <br />iv <br />