My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48290
DRMS
>
Back File Migration
>
Report
>
REP48290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:11 AM
Creation date
11/27/2007 12:17:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Report
Doc Date
12/8/1982
Doc Name
LICENSE AUTHORIZATIONS & STIPULATIONS COTTER CORP SCHWARTZWALDER ORE CRUSHER-SORTER ORE TRANSFER PAD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LC 14.0 <br />R E C L A ?1 A T I O N R E Q U I R E M E N T S <br />:iATER TP,EATMENT ?LAN T, L'iPOUND:IENTS <br />AND DRYING AREAS, A:QD <br />14.2 CRITERIA <br />These sites shall be decontaminated to background radiation <br />ranges in accordance with applicable state and federa] <br />regulations in effect at the time, based on a statistically <br />defensible set of soil measurements with depth. They shall be <br />reclaimed in accordance with the requirements of the Colorado <br />Efined Land Reclamation Board permit and returned to unrestricted <br />use. <br />14.2.1 Contaminated materials remaining from decommissioning after <br />final facility shutdown shall be removed, treated and disposed <br />of in a manner approved by the Department. <br />3 RECLeV~]ATION SURETY <br />14.3.1 The licensee shall maintain in force a surety pursuant to <br />6 CCR 1007-1-3.9.4 for the decommissioning and decontamination <br />of the crusher-sorter, ore storage and transfer areas, and for <br />the reclamation of the water treatment plant and impot.ndments <br />and drying areas. <br />14.3.2 APfOUNT OF SURETY <br />The decommissioning, decontamination, and reclamation surety <br />shall be maintained sufficient to fully comply with L(: 11.1.8, <br />and 6 CCR 1007-1. The Surety Agreement entered into t~etween the <br />licensee and the State is hereby incorporated by reference as a <br />condition of the license. A surety of $663,879 is necessary to <br />insure compliance according to the following schedule (in 1982 <br />dollars): <br />14.3.2.1 Crusher Sorter and Ore Storage Area <br />Decontamination of buildings <br />Removal of buildings and pads (Net above MLRD bond) <br />Removal of underlay materials <br />Decontamination of equipment <br />Transportation for disposal <br />Soil Material* <br />Clay (delivered and compacted)* <br />Topsoil (delivered and compacted)* <br />Mulching* <br />Seeding* <br />Fertilizer* <br />* covered by :1LRD bond <br />S 26186 <br />320 <br />2396 <br />1750 <br />4920 <br />16800 <br />-32- <br />
The URL can be used to link to this page
Your browser does not support the video tag.