Laserfiche WebLink
<br />b. Provide a detailed health and safety analysis which reflects that the <br />residual amounts of materials on surface areas, together with other <br />ronsidexations such as prospective use of the premises, equipment or <br />scrap, are unlikely [o result in an unreasonable risk to tae health <br />and safety of the p8blic. <br />5. Prior to release ~f premises for unrestricted use, the licensee shall make <br />a comprehensive radiation survey which establishes that contamination is <br />within the limits specified ir. Table I. ~ copy of the survey report sha1.L <br />be filed with the Radiation Control Division, Co r redo Department of <br />I-lealth. The report should be filed at leas[ 00 days prior to the planned <br />date of abandonment. the survey repot[ shall: <br />a. Identify the premises. <br />b. Show [hat reasonable effort has been made tc eliminate residual <br />contamination. <br />c. Describe *_he ;;cope of fire survey and general procedures followed. <br />d. Slate the fiadino of the survey in units specified in the instruction. <br />c'ollowing review of [r.e report, the Department will consider visi[ino [he <br />facilities to confirm [he survey. <br />-29- <br />