My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48290
DRMS
>
Back File Migration
>
Report
>
REP48290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:11 AM
Creation date
11/27/2007 12:17:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Report
Doc Date
12/8/1982
Doc Name
LICENSE AUTHORIZATIONS & STIPULATIONS COTTER CORP SCHWARTZWALDER ORE CRUSHER-SORTER ORE TRANSFER PAD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />13.4.10 FACILITIES EXtLaUST :iONITORING <br />13.4.10.1 The crusher sorter building exhaust shall be sampled quarterly <br />and analyzed for Uranium, Lead-210, Thorium-230 and <br />Radium-226. Sampling shall be representative, and adequate <br />for determination of the release rates and concentrations of <br />uranium. <br />13.4.10.2 The flow rates of the process exhaust identified above shall <br />be measured semiannually and whenever any process equipment <br />changes are made that might significantly alter the flow rate. <br />13.4.11 EWIRON2fENTAL P10[dITORING <br />Tlie licensee's environmental monitoring and analysis program <br />shall be as in the Procedures Manual, required by LC 11.1.8, <br />in accordance USNRC Reg. Guide 4.14 as applicable, and shall <br />be sufficient Co enable the Department to estimate, with <br />reasonable assurance, ma:;imum potential radiation dcse <br />commitment to individuals and populations offsite: <br />13.4.11.1 Air [4onitoring <br />Environmental air monitoring for particulates shall be <br />continuous for uranium, Radium-226, Thorium-230, and Lead-210 <br />at two site locations, and at least one nearest feasible <br />residence and control location. Radon-222 shall be measured <br />at the same locations for one week per month. .fethods and <br />frequencies shall be as referenced in the Procedures P:anual <br />required by LC 11.1.8. Air monitoring results shall to <br />reported semiannually to the Department. <br />13.4.11.2 Water Plonitoring <br />Surface water monitoring shall be at least monthly unless <br />otherwise approved by the Department and in accordance with <br />Department approved procedures. Water monitoring shall be <br />done on Ralston Creek at least at the following Pointe: <br />1. upstream of the mine waste piles <br />2. between the mine waste piles and the 001 discharge <br />3. the 001 discharge <br />4. downstream a[ the cattle gate <br />5. at the Long Lake head Sate <br />Ground water monitoring shall be done quarterly at the: ti~ree <br />wells identified LC 11.1.6 and Cotter well 64684. <br />-20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.