Laserfiche WebLink
<br />13.3.4.2 Freeboard <br />a minimum of six inches freeboard shall be maintained at all <br />times on ccntainmen[ ponds, except for ponds containing treated <br />water. Increased free board shall be maintained as appropriate <br />for imp~>undments designated to receive emergency discharges. <br />13.3.4.3 Inspections <br />The int~:grity of the containment systems, and associated <br />structures and plumbing shall be verified a[ least once per day <br />by docuc~ented inspections by trained personnel, in accordance <br />with procedures as in the Procedures 7tanual re?uired by <br />LC ll.l.o". <br />13.3.4.4 :~tainten~ince <br />Eeauirect maintenance, repair and erosion control shall be as <br />expedit~.ous as possible. <br />13.3.5 GE.:iER?L PROJECT :1:1INTEt1~:<CE <br />A1L s[ora~e, processing, transport, containment, monitoring, and <br />sa.Eety systems shall be maintained in food working order and in <br />a manner to preclude or minimize unscheduled releases of <br />ra~iioact:ive or toxic materials. <br />13.3.6 SA.FETY', SECURITY, FE.:CI`JG, POSTLSG, <br />dR_d C02iTnOL. PROTECTIVE CLUT9I:1G <br />13.3.6.1 Re;ponsioilit~~ <br />13.3.6.1.1 The Facilities Manager shall be accountable for safety, <br />security, fencing, pos[inb, and area control. <br />13.3.6.1.2 The kSO or his designated assistant shall have authority [o <br />reiaove employees from a work environment or suspend the <br />operation in a particular processing area if he has determined <br />[h;it a condition exists [hat would likely result in any <br />individual being exposed to radiation that may present an <br />imminent. health hazard. <br />13.3.6.1.3 The Facilities :tanager shall act promptly on the <br />of the RSO or his designated assistant ?ertaining <br />sa.:e[y and security. <br />recommendations <br />to radiation <br />-14- <br />