Laserfiche WebLink
~E2'~ 2XtC~ ~I~IIES <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT -FIELD DENSITY TESTS <br />Date: Friday, Aug/25/O6 Arrive Time: 10:00 a.m. <br />Depart Time: 11:15 a.m. <br />Project Name: Miscellaneous Testing Weather: Clear <br />Project Number: M06072MT Temp: <br />Client: West Elk Mine Client Representative: <br />General Contractor: West Elk Mine Supervisor: Henry Barbe <br />Specialty Contractor: Specialty Superintendent or Foreman: <br />Source of Fill Material: Coal Gob Plans and Specs: <br />Prepared by: Dated: <br />Contractor's Equipment Used: <br />Lambert and Associates Equipment Used -Manufacturer: CPN Serial Number or Unit Number: 14 <br />Test Results were Verbally Given On-Site to: Henry Barbe <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: None <br />Concerns for Next Visit: None Retests Needed: Nene <br />Other personnel contacted on-site: namelfirm <br />Notes: <br />Please refer to the test results sheets for approximate test locations and test results. The test results indicate only the <br />relative compaction and moisture content of the material tested at the elevation and location tested at the time of our <br />site visit. <br />~...... - .. ;-~; .~. F -- <br />Lambert and Associates Technician: Hamilton <br /> <br />