Laserfiche WebLink
<br />- .. <br />As approved by the DMG, water continued to be transported from the evaporation system <br />collection pond to the tailings impoundment. The total volume moved during the month was . <br />1,307,200 gallons. 540,000 gallons by truck and 767,200 gallons by pumping. <br />The five flow window wells were all operating at month's end. These five wells are M-18, M-19, M-20, <br />M-28 and M-29. The combined flow from these wells was approximately 99 gpm. <br />Si cerely, ' <br />Ron Zu walt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />