Laserfiche WebLink
TABLE OF CONTENTS <br />1.0 INTRODUCTION ......................................... 1 <br />2.0 DESCRIPTION OF PILE CONFIGURATION AND PHASING .... 2 <br />2.1 Final Upper Refuse Pile Configuration .......................... 2 <br />2.2 Phasing ................................................. 3 <br />2.3 Materials Balance ......................................... 3 <br />3.0 TOPSOIL STORAGE ...................:.................. 4 <br />4.0 SUBSOIL STORAGE ...................................... 5 <br />5.0 GEOTECHNICAL STUDIES ................................ 6 <br />5.1 Topography and Geology .................................... 6 <br />5.2 HydroIogy ............................................... 7 <br />5.3 Slope Stability Analysis Model Pazameters ...................... 7 <br />5.4 Slope Stability Analysis Computed Results ..................... 11 <br />5.5 Surface Creep Monitoring Stations ............................ 13 <br />6.0 SURFACE DRAINAGE CHANNELS ........................ 14 <br />7.0 UNDERDRAINS ......................................... 16 <br />S.0 HYDROLOGY AND HYDRAULICS .......................... 17 <br />9.0 ACCESS ROAD .......................................... 18 <br />10.0 CONVEYOR SYSTEM ..................................... 19 <br />REFERENCES ............................................... 20 <br />i <br />