Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 1 Inspection - 15i Quarter 2007 <br />On March 12, 2007, I performed the required quarterly visual inspection of the Cameo <br />Refuse Disposal Area No. 1 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. <br />The south under drain was dry. The pile was mostly dry with a few damp spots along <br />the terraces. No seepage was noted around the pile. The upper diversion ditch and <br />collection ditches were inspected with no problems noted. <br />The access road to the pile, which is the west extension of Haul Road No. 5, remains <br />open to accept coal and refuse material from other reclamation activities. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 1 refuse pile have been constructed as permitted in the design approved by <br />the DBMS. <br />Recommended maintenance: None <br />a•~M\Oa~ r' L .~ ~ 1. <br />' V O°Fa ~ JG~ M1 '.A~-~ <br />~ e1 %-< A <br />iF ~ .~J~.: ~.f _ <br />~ I, ~y <br />~O ~Q 1 m ~~ ~d <br />J $~~.° ~ , c Date <br />P.E.~'cp~l~~2$0 <br />