Laserfiche WebLink
'yJ <br />iii iiiiiiiiiiiu iii <br />999 <br />TIPTON AND KALMBACH, INC. <br />a..E Pe ~. <crv,~.•L.su~ c .,o~ <br />Ise awn R.,-oc :*~cn <br />C~~NTON w. ,+EVRW G. Pn E51DENi <br />E. R. NIGR[LL,ExEC. VICE RRESID ErvT <br />v. G. DISNOP. VICE PR ESIO ENT <br />O~J~ DE VTSC M.TREPSVPER <br />J. R.TURN ER. SECRETGRT <br />DENV ER,COLORADO 80202 <br />R.,oNE r]o]i s•z~eoal <br />May 5, 1981 <br />Mr. Richard Atkinson <br />Colowyo Coal Company <br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />Subject: Stability of the Spoil Fill in Streeter Gulch <br />Dear Mr. Atkinson: <br />C <b~C <br />1RTIP - DENVER <br />Trv 910~6]1~29a0 <br />On 27 April 1981 and 30 April 1981, I met wirli representatives of Colowyo Coal <br />Company to discuss your proposed change of the configuration of the spoil fill in Streeter Gulch. <br />On the afternoon of 30 April 1981, I accompanied representatives of Colowyo Coal Company <br />(Messrs. McDonald, Brown and Atkinson) to t{ie offices of the OfFice of Surface Mining where <br />representatives of the Office of Suiiace Mining and the Mined Land Reclamation Division were <br />apprized of your proposed change. In this meeting, I stated that it was my opinion that the <br />proposed change in con Figuration would have a minimal effect on the stability of the spoil fill. <br />The purpose of this letter is to confirm this opinion. <br />The configuration of the spoil fill as originally planned starts at a toe elevation of <br />approximately 6588 feet and includes 30-foot wide benches at EI. 6700, EI. 6800, and EI. <br />6900. The slope between the benches is 3 horizontal on 1 vertical. The material to be placed <br />above the bench at EI. 6900 was to be placed on a flatter slope to EI. 7100. The slope between <br />EI. 6900 and EI. 7100, when measured in a plane that is continuous with the 3:1 slope between <br />EI. 6588 and EI. 6900, was ro be approximately 6 horizontal on 1 vertical. The fill has been <br />completed to this configuration From the roe ro EI. 6900. <br />It is our understanding that the proposed chonge in the configuration is between EI. <br />6900 and EI. 7300. For the purposes of the stability analysis, the slope between EI. 6900 and <br />EI. 7300, when measured in a plane that is continuous ~.vith the 3:1 slope between EI. 6588 and <br />EI. 6900, is to be approximately 3 horizontal to 1 vertical. After odditionol study, you may <br />determine that some additional berms are to be added which would tend to slightly flatten the <br />slope. <br />Fhe stability of the spoil Fill in Streeter Gulch is the subject of reports prepared by <br />W. A. Wahler 8. Associates, Golder Associates, Inc., CTL/Thompson, Inc., and Tipton and <br />Kalmbach, Inc. The latest and most comprehensive investigation v+as prepared for the Office <br />of Surface Mining by CTL/Thompson, Inc., and the results are shown in a report entitled, <br />