Laserfiche WebLink
Robinson Brick Company is filing this Annual Report providing a Notice .if Intent to <br />Continue Mining Operations at Buffalo Mine located in Elbert County, Colorado. The <br />mine has a phased reclamation plan. <br />Operations (Current Year) <br />Mining operations continue in accordance with the mine plan. The permit?ed acreage <br />remains at 415 acres and the maximum allowable disturbed acreage remains at 30 acres. <br />No additional acres were disturbed this period. Current disturbance is approximately 6.5 <br />acres in Phase III including the main road. No additional acres were reclaimed during this <br />reporting period. <br />Operations (Next Year) <br />Mining operations in 2005-2006 will disturb no additional acres. <br />Bonding <br />Deemed adequate at this time. <br />