My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47954
DRMS
>
Back File Migration
>
Report
>
REP47954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:51:45 AM
Creation date
11/27/2007 12:11:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Report
Doc Date
1/5/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110D CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.• ~ <br />DGMC <br />• PO BOX 96 • <br />HESPERUS, CO 81326 <br />Permittee Name: DGMC <br />Permit No: M-86-076 <br />Operation Name: Incas Mine <br />Anniversary date: 12/31/97 <br />Re: Addition to comments of 1997 annual report <br />1 . The laboratory results of 1997 compliance monitoring water samples will be forwarded in 1998 when <br />the results are available from Hazen Research, Inc. of Golden, Colorado. The 1997 compliance monitoring <br />water samples have the following sample identification: <br />location & number <br />1997 compliance <br />underground water <br />Adit 1 <br />97111001 <br />2. There were no reclamation activities in 1997. <br />location & number <br />surface water <br />Lower Compliance <br />97111102 <br />3. No mine related roads were graded during the year. <br />4. There was no heavy equipment at the ntinesite anytime during 1997 or on the mineroads. <br />5. About 8 tons of ore was mined by hand in a vein adjacent to [he pilot plant. <br />6. There was no construction of buildings in 1997. <br />7. During the mining season of middle of May thru middle of November, most of the work at the mine <br />consisted of installing electric pumps, motor controls, and programmable controller in the pilot processing <br />plant. <br />8. The temporary pilot plant for processing ore was operated sporadically from September 19 thru <br />October 20. About 8 tons of ore were processed. Processing plant ball mill ore feed rate was 1,000 <br />pounds per hour. <br />9. Access to the Incas Mine site is controlled by private roads with 2 locked gates to limit access to <br />those individuals with keys. <br />Bob Hill <br />Incas Mine <br />anrpt-97 \ dgmc 5 12/30/97 /dmg/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.