Laserfiche WebLink
Annual Report for the Maybell Mine <br />2003-2004 <br />No mining or excavation occurred at the property during the past yeaz. <br />At this time, construction activity is scheduled for next year. Umetco expects to borrow <br />approximately 35,500 cubic yards of material from the site during the 2005 construction <br />season. <br />A map is not enclosed because there has been no activity at the site since the last map <br />update. <br />