My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47880
DRMS
>
Back File Migration
>
Report
>
REP47880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:51:39 AM
Creation date
11/27/2007 12:10:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Report
Doc Date
5/1/1980
Doc Name
AMENDED APPLICATION FOR RADIOACTIVE MATERIAL LICENSE FOR ORE SORTING FACILITY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ~ <br />• 5.2.4 Ralston Creek Sampling <br />Monthly grab samples will be taken at two sites, upstream and downstream <br />of the waste pile , as long as there is water flowing in the o~eek, waters will <br />be analyzed for Ra-226 and U. (See Figure 1.1-2.) <br />5.2.5 Ambient Air Sampling <br />As stated in Section 2, two high volume air samplers have been installed. <br />Two passive radon monitors will be colocated with the high volumes a:> soon as they <br />are received. One additional radon monitor will be installed in the area of <br />56th and Pine Ridge Road. (See Figures 1.1-1 and 1.1-2.) <br />5.2.6 Radium and/or Uranium Uptake by Plants <br />This one-time study is set up at the site adjacent to the wa~;te pile, <br />and should give an indication of uptake of Ra-226 and/or Uranium as z~ result of <br />• runoff from the waste pile. It consists of 3 or 4 parallel lines from the waste <br /> pile to the creek following a direct line with the runoff. Samples Neill be <br />taken along each line at 2 to 3 foot intervals. Samples will be analyzed for <br />Ra-226 and Uranium. <br />5.2.7 Infiltration/Runoff Study <br />The final study proposed will take place when there is no flow in Ralston <br />Creek. After a tunderstorm, water samples will be taken at the four vegetation <br />sampling sites described above, as long as there is flow in the creek. These <br />samples will be analyzed for Ra-226 and U. The data from this test should supple- <br />ment the data given in Table 2.2-1. Meterological conditions will bra recorded <br />including rainfall and temperature as well as antecedent soil moisture conditions. <br />The data obtained from this waste dump runoff study will be combined with <br />the data presented in Table 2.2-1 for the purposes of discussing rainfall infil- <br />• tration into the waste dump following reclamation. The mitigating ei`fects of the <br />waste dump soil cover, dilution of waste dump runoff by stream flow, and other <br />factors will also be discussed. <br />F-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.