Laserfiche WebLink
<br />BOWIE RESOURCES, LIMITED <br />July 18, 1996 <br />The following Table shows relative change in points from May, <br />1996 to June, 1996. <br />STATION BEARING DISTANCE ELEVATION <br />6 N55033'13"E 0.18 0.00 <br />14 S38°15'14"W 0.07 -0.02 <br />15 574000'38"W 0.09 -0.04 <br />16 516023'36"W 0.17 +0.18 <br />PL-1 N29059'27"E 0.31 -0.33 <br />PL-2 533035"40"E 0.03 +0.07 <br />PL-3 S75o49'36"W 0.06 +0.01 <br />PL-4 536°58"24"W 0.12 +0.01 <br />PL-5 563041'30"W 0.13 +0.07 <br />PL-6 N89o35'00"W 0.07 -0.03 <br />• PL-7 S69°00'07"W 0.11 +0.24 <br />This Table shows a relative change in the Subsidence Points <br />horizontal movement with a distance change ranging from 0.03 feet <br />to 0.31 feet. Elevations change range from +0.24 to -0.33. <br />Changes in value of the coordinates for the Subsidence Points may <br />be the result of a variety of factors: <br />1. Actual changes in points due to subsidence activity; <br />2. Random errors inherent to any field survey. <br /> <br />If you have any questions, please call. <br />x. Lexoy niacx <br />ELB:lml D:HD Bowie <br />SubPIT61.796 <br />Enclosure - Map <br /> <br />PAGE 13 <br />