Laserfiche WebLink
INSTRUCTIONS <br />ESTABLISH BASELINE <br />30 meter transect with stakes driven at 6 meter intervals. <br />2. TRIANGULATE PLOT STAKES <br />From baseline stakes, at 4 meter perpendicular and 7.25 meter diagonal offsets <br />Drive a stake at each plot corner. According to Figure I . <br />3. FLAG PLOTS <br />Individual plots designated as GD l-5, DA I-5, TP 1-5, or C 1-5. According to <br />Figure 3. <br />4. PLANT SEEDLINGS <br />Each plot to receive 8 AMEALN, 8 PRUVIR, and 8 QUEGAM According to <br />Figure 2. <br />5. APPLY TREATMENTS <br />Mix and apply Deer-Away and Tree Guard to every plant in plots designated <br />DA and GD respectively. Assemble Tree Pro around even, seedling in plots <br />designated TP Do not apply any treatments [o plots designated C. <br />6 PHOTOGRAPH AND RECORD ANY RELEVANT OBSERVATIONS <br />Please note orientation (North arrow) of experiment plot on Figure + diagram. <br />Photograph the site from each metal cornerpost, shooting diagonally to the far <br />corner <br />