Laserfiche WebLink
CDLONyD MINE Page 5 <br />Sample Flow <br />Date Rate <br />cfs <br />________ _______ <br />12/06/99 0.000 <br />01/07/00 0.000 <br />02/0]/00 0.000 <br />03/07/00 0.940 <br />04/1]/00 1.060 <br />06/05/00 0.590 <br />07/03/00 0.000 <br />07/31/00 0.000 <br />08/21/00 0.000 <br />09/07/00 0.000 <br />10/02/00 0.000 <br />11/OB/00 0.000 <br />12/04/00 0.000 <br />02/05/01 N <br />03/05/01 0.490 <br />Note: N ~> No measurement <br />