Laserfiche WebLink
a <br />z <br />z <br />KEENESBURG ASHDATA <br />Standby Ash <br />Date Driver 894 895 Trailer Time Loads Tons Comments SB Pit NB Pit WA Pit Total Toro <br />1 1 /0111 9 9 9 Kipp 220 0 112 0.0 2 48.50 180,081 5,667 244,350.00 430,098.00 <br />1 1101 /1 9 9 9 D. Snider 0 329 114 0.0 3 72.75 Cvr ash 311; wtr 600 180,154 5,687 244,350.00 430,170.75 <br />11102/1999 D. Snider 0 330 114 0.0 3 72.75 160,227 5,667 244,350.00 430,243.50 <br />11/02/1999 Kipp 329 0 112 0.0 3 72.75 180,300 5,667 244,350.00 430,318.25 <br />11/03/1999 Kipp 0 .220 114 0.0 2 48.50 180,348 5,667 244,350.00 430,384.75 <br />11!03/1999 J. Snider 330 0 112 0.0 3 72.75 Cvr ash 311; wtr 600 180,421 5,667 244,350.00 430,437.50 <br />11/04!1999 J. Snider 330 0 112 0.0 3 72.75 180,494 5,867 244,350.00 430,510.25 <br />11!0411999 Cordes 0 332 114 0.0 3 72.75 180,568 5,687 244,350.00 430,583.00 <br />11/05/1999 Cordes 0 222 114 0.0 2 48.50 Cvr ash 311; wtr 600 180,615 5,687 244,350.00 430,631.50 <br />11/05/1999 J. Snider 330 0 112 0.0 3 72.75 180,686 5,887 244,350.00 430,704.25 <br />11/06/1999 D. Snider 0 329 114 0.0 3 72.75 180,780 5,667 244,350.00 430,777.00 <br />11/06/1999 J. Snider 330 0 112 0.0 3 72.75 160,633 5,667 244,350.00 430,849.75 <br />11/07/1999 J. Snider 220 0 112 0.0 2 48.50 Chg oi18 fillers 894; grs 894 8 112 180,882 5,867 244,350.00 430,898.25 <br />11/07/1999 D. Snider 0 220 114 0.0 2 48.50 Cvr ash 311; wtr 600; slope sidewall 233 180,930 5,667 244,350.00 430,946.75 <br />11/06/1999 D. Snider 0 330 114 0.0 3 72.75 181,003 5,667 244,350.00 431,019.50 <br />,~ 11/08/1899 J. Snider 329 0 112 0.0 3 72.75 181,076 5,687 244,350.00 431,092.25 <br />~ 11!09/1999 J. Snider 220 0 112 0.0 2 48.50 Cvr ash 311 161,124 5,667 244,350.00 431,140.75 <br />~ 11/09/1998 D. Snider 0 330 114 0.0 3 72.75 Wtr ash 600 181,197 5,667 244,350.00 431,213.50 <br />11/10/1999 D. Snider 0 329 114 0.0 3 72.75 181,270 5,667 244,350.00 431,266.25 <br />11/10!1999 J. Snider 328 0 112 0.0 3 72.75 181,342 5,667 244,350.00 431,359.00 <br />11/11!1999 J. Snider 219 0 112 0.0 2 48.50 Cvr ash 311; wtr 600 181,391 5,667 244,350.00 431,407.50 <br />11/11/1999 Cordes 0 333 114 0.0 3 72.75 181,484 5,887 244,350.00 431,480.25 <br />11/12/1999 J. Snider 219 0 112 0.0 2 48.50 181,512 5,687 244,350.00 431,528.75 <br />11112/1999 Cordes 0 332 114 0.0 3 72.75 181,585 5,867 244,350.00 431,601.50 <br />11/1311999 Klpp 110 0 112 0.0 1 24.25 181,609 5,667 244,350.00 431,625.75 <br />11113/1999 Cordes 0 333 114 D.0 3 72.75 Cvr ash 311; wtr 600 181,882 5,667 244,350.00 431,698.50 <br />1111411999 Kipp 329 0 112 0.0 3 72.75 181,755 5,887 244,350.00 431,771.25 <br />11/1411999 Cordes 0 332 114 0.0 3 72.75 181,827 5,667 244,350.00 431,844.00 <br />1 111 511 99 9 Kipp 219 0 112 0.0 2 48.50 Cvr ash 311; wtr 600; slope sidewall 233 181,878 5,667 244,350.00 431,892.50 <br />11115/1999 Cordes 0 222 114 0.0 2 48.50 181,924 5,887 244,350.00 431,941.00 <br />1 111 6 /1 99 9 Kipp 222 0 112 0.0 2 48.50 181,973 5,667 244,350.00 431,969.50 <br />1111611999 Cordes 0 332 114 0.0 3 72.75 182,048 5,667 244,350.00 432,062.25 <br />t 1117/1999 Kipp 219 0 112 0.0 2 48.50 Cvr ash 242; wtr 600 182,094 5,667 244,350.00 432,110.75 <br />11/17/1999 Cordes 0 222 114 0.0 2 48.50 182,143 5,667 244,350.00 432,159.25 <br />1 111 811 999 J. Snider 221 0 112 0.0 2 48.50 182,191 5,687 244,350.00 432,207.75 <br />11/18/1999 Cordes 0 332 114 0.0 3 72.75 182,264 5,667 244,350.00 432,280.50 <br />11119/1999 Cordes 0 111 114 0.0 1 24.25 162,288 5,667 244,350.00 432,304.75 <br />1 111 9/1 99 9 J. Snider 330 0 112 0.0 3 72.75 Cvr ash 311; wtr 600 162,381 5,667 244,350.00 432,377.50 <br />1120/1999 J. Snider 330 0 112 0.0 3 72.75 182,434 5,667 244,350.00 432,450.25 <br />