x
<br />x
<br />•
<br />KEENESBURG ASHDATA
<br />Standby Ash
<br />Date Driver 894 895 Trailer Time Loads Tons Comments SB Pi[ NB Pd WA Pi[ Total Tons
<br />07!16!1999 J. Snider -220 0 112 0.0 -2 -48.50 Duplicated in Juy 171,182 5,867 244,350.00 421,198.25
<br />08/01/1999 D. Snider 0 220 114 0.0 2 48.50 Cvr ash 311; vAash 600 171,230 5,667 244,350.00 421,246.75
<br />08/01/1999 J. Snider 220 0 112 0.0 2 48.50 Fix flattire 112 171,279 5,687 244,350.00 421,295.25
<br />08/OZ199B J. Snider 108 0 112 0.0 1 24.25 Take 112 to Transwest for DOT insp 171,303 5,667 244,350.00 421,319.50
<br />08/02/1999 D. Snider 0 164 114 0.0 1 24.25 Take 114 to Transwest 171,327 5,667 244,350.00 421,343.75
<br />0 810 3/1 9 9 9 D. Snider 111 0 112 0.0 1 24.25 PU 112 at Transwest 171,351 5,867 244,350.00 421,368.00
<br />0 610 3/1 9 9 9 D. Snider 0 111 174 0.0 1 24.25 Cvr ash JCB 171,378 5,667 244,350.00 421,392.25
<br />08/04/1998 D. Snider 0 330 114 0.0 3 72.75 Cvr ash JCB; vA esh 600 171,448 5,867 244,350.00 421,465.00
<br />08/04/1999 J. Snider 330 0 112 0.0 3 72.75 171,521 5,667 244,350.00 421,537.75
<br />06/05/1999 D. Snider 329 0 112 0.0 3 72.75 171,594 5,887 244,350.00 421,610.50
<br />08!05/1998 Cordes 0 221 114 0.0 2 48.50 171,642 5,667 244,350.00 421,659.00
<br />0 8/0611 99 8 J. Snider 220 0 112 0.0 2 48.50 Cvr ash 242 171,691 5,667 244,350.00 421,707.50
<br />08!06/1999 Cordes 0 220 114 0.0 2 48.50 Wtr ash 600 171,739 5,887 244,350.00 421,758.00
<br />08/07/1999 J. Snider 220 0 112 0.0 2 48.50 Slope sidevrell 233 171,788 5,667 244,350.00 421,804.50
<br />08/07/1999 Cordes 0 220 114 0.0 2 48.50 Cvr ash 311;vRr600 171,836 5,687 244,350.00 421,853.00
<br />,~ 08108/1999 D. Snider 219 0 112 0.0 2 48.50 171,685 5,667 244,350.00 421,901.50
<br />° 06/0611998 Cordes
<br />w 0 220 114 0.0 2 46.50 171,933 5,667 244,350.00 421,950.00
<br />~ 08/09/1998 D. Snider 0 328 114 0.0 3 72.75 172,006 5,667 244,350.00 422,022.75
<br />0 810 9/1 9 9 9 i0pp 329 0 112 0.0 3 72.75 Cvr ash 242; wtr 600 172,079 5,667 244,350.00 422,095.50
<br />08!1011999 D. Snider 327 0 112 0.0 3 72.75 Cvr ash JCB 172,152 5,687 244,350.00 422,168.25
<br />08/7011999 Cordes 0 330 114 0.0 3 72.75 172,224 5,667 244,350.00 422,241.00
<br />08/11/1999 Cordes 0 328 114 0.0 3 72.75 Cvr ash 311; wlr 600 172,297 5,667 244,350.00 422,313.75
<br />08112/1999 J. Snider 329 0 112 0.0 3 72.75 172,370 5,667 244,350.00 422,386.50
<br />08/12/1999 Cordes 0 330 114 0.0 3 72.75 172,443 5,887 244,350.00 422,459.25
<br />08/13/1999 J. Snider 329 0 112 0.0 3 72.75 Cvr ash 311; wtr 600 172,515 5,667 244,350.00 422,532.00
<br />08/13/1899 IGpp 0 219 114 0.0 2 48.50 Slope sidewall 233 172,564 5,687 244,350.00 422,580.50
<br />08/14/1999 D. Snider 0 219 114 0.0 2 48.50 172,612 5,687 244,350.00 422,629.00
<br />08/14/1999 J. Snider 328 0 112 0.0 3 72.75 172,685 5,667 244,350.00 422,701.75
<br />08/1 511 9 9 9 D. Snider 0 218 114 0.0 2 48.50 172,734 5,887 244,350.00 422,750.25
<br />08/15/1999 J. Snider 218 0 112 0.0 2 48.50 Cvr ash 311; vitr 600 172,782 5,667 244,350.00 422,798.75
<br />08!1611999 J. Snider 326 0 112 0.0 3 72.75 172,855 5,867 244,350.00 422,671.50
<br />06/16/1999 D. Snider 0 328 114 0.0 3 72.75 172,928 5,667 244,350.00 422,944.25
<br />08/17/1999 J. Snider 219 0 112 0.0 2 48.50 Grs 894 8. 112; slope sidewall 233 172,978 5,887 244,350.00 422,992.75
<br />08/17/1999 D. Snider 0 328 114 0.0 3 72.75 Cvr ash 311; wtr 600 173,049 5,687 244,350.00 423,065.50
<br />08/18/1999 J. Snider 219 0 112 0.0 2 48.50 173,097 5,667 244,350.00 423,114.00
<br />08!1811999 D. Snider 0 328 114 0.0 3 72.75 173,170 5,687 244,350.00 423,168.75
<br />08/19/1999 D. Snider 327 0 112 0.0 3 72.75 Cvr ash 311 173,243 5,867 244,350.00 423,259.50
<br />08/19/1999 Cordes 0 330 114 0.0 3 72.75 Wtr esh 600 173,316 5,887 244,350.00 423,332.25
<br />0820/1999 Cordes 0 219 114 0.5 2 48.50 W/O acid truck 173,384 5,667 244,350.00 423,380.75
<br />
|