My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47787
DRMS
>
Back File Migration
>
Report
>
REP47787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:51:32 AM
Creation date
11/27/2007 12:08:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
9/13/2002
Doc Name
2001 AHR, Intro Thru Appendix D
From
Mountain Coal Company
To
DMG
Annual Report Year
2001
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine 2001 Mnual Hydrology Report 21 <br />settling of sediment occurs prior to discharge (batch mode). In WY2001, pond MB-1 and MB-2R <br />discharged 5 ac-ft and 112 ac-ft of water to the North Fork, respectively. <br />4.3.2 Ponds MB-3, MB-4, and MB-5 <br />Ponds MB-3 and MBA receive stormwater runoff and wash down water from the conveyors, silos, <br />and load out facilities. Pond MB-5 collects only stormwater runoff. In WY2001 these ponds <br />collected a small amount of water resulting in dischazges of about one ac-ft. <br />4.3.3 Pond FW-1 <br />Pond FW-1 is designed to store raw fresh water from the North Fork diversion intake gallery. <br />Pond FW-1 water is pumped to the WWTP and the Project's domestic water system. If the pond <br />overfills, excess water is discharged back to the North Fork. No discharge to the North Fork <br />occurred in WY2001. <br />4.3.4 RPE Pond <br />The RPE Pond collects runoff from the refuse pile expansion azea. In WY2001 no discharge <br />occurred from the RPE pond. <br />4.3.5 Pond SG-1 <br />Pond SG-1 was built to collect runoff during and after construction of the mine ventilation shafts. <br />Discharge from SG-1 is routed to Sylvester Gulch. In WY2001 one ac-ft of water was dischazged <br />from SG-1. <br />4.4 Biomonitoring Testing for Toxicity <br />During WY2001, MCC conducted biomonitoring tests as required for the CPDS permit. Testing <br />included whole effluent toxicity or "WET" tests. Biomonitoring samples were collected quarterly <br />from the West Fork of Sylvester Gulch effluent dischazge (outfall 017). Static toxicity tests for <br />acute (48-hour) and chronic (96-hours) conditions were run. The test organisms included the <br />daphnid (Daphnia magna) and the fathead minnow (Pimephales prome[as). The test results <br />indicated that the effluent was not acutely toxic to either species in WY2001 and that the West Elk <br />Mine was in compliance with its CPDES permit WET limitations. <br />J <br />Project # 00301 HydroGeo, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.