My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47766
DRMS
>
Back File Migration
>
Report
>
REP47766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:51:30 AM
Creation date
11/27/2007 12:08:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
10/15/1993
Doc Name
SOMERSET MINING CO GOB PILE INSPECTION REPORTS PN C-81-022
From
J E STOVER & ASSOCIATES
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Third Quarter 1991 <br />ENGINEERING INSPECTION <br />SOMERSET MINING COMPANY'S EAST YARD GOB DISPOSAL PILE <br />e~ <br />On October 2. 1991 I performed a visual inspection of the east <br />yard gob disposal area at Somerset Mining Company's Somerset <br />Mine. The gob disposal area was dry. Both Bear Coal Company and <br />Somerset Mining Company have approval to dispose of coal mine <br />waste in the gob pile. <br />Page 2.05-19, revision 3 dated 7-18-90, of Somerset Mining <br />Company's approved permit document includes the requirement to <br />inspect the coal mine waste pile for stability quarterly. The <br />inspection is to be performed by a registered engineer or other <br />qualified professional specialist experienced in construction of <br />earth and rockfill embankments. The quarterly inspection report <br />is to note the volume of waste material placed in the pile since <br />the last inspection. <br />Somerset Mining Company hauled approximately 1600 tons of gob to <br />the pile during the quarter. The material came from the initial <br />excavation work of the Sanborn Creek Mine portals. As of the <br />date of the inspection the material had not been compacted. <br />No organic material or topsoil was removed Yrom the perimeter of <br />the pile during the quarter. The side slopes of the pile vary in <br />steepness Yrom 2H:1V to 2.5H:1V. No seepage from under or around <br />the pile was detected during the inspection. Nothing xas ob- <br />served during the inspection that would indicate that the pile <br />has a potential for failure. <br />.4 failure of the pile would probably not be a hazard to human <br />life or property. The pile is located above a large flat bench <br />referred to as the east yard. This bench is 80' to 100' wide <br />directly below the pile. If the coal mine waste pile failed it <br />would very likely be contained in the east yard. <br />CERTREF3 <br />J es E. Stover a°p0 ,cEC! to <br />lorado Registerp~•~S E. S,r•; ~' ~ <br />rofessional Eng~c~P,~ No. f$$~.tP, <br />-~; <br />v. <br />~, <br />°~ 19230 "'` <br />e~: <br />o ~ .,. e <br />.~ "•, <br />.~r'S ••.....••~~~~ <br />•~lOfrR: o°s <br />V N Y Q s <br />
The URL can be used to link to this page
Your browser does not support the video tag.