Laserfiche WebLink
ii iiiiiiiiiiiu iii <br />999 <br />• , ;: <br />B & B EXCAVATING, INC. <br />Drawer 249 -- <br />Vail, Colorado 81658 <br />926-3311 • Fax 926-2344 <br />May 12, 199 3 <br />Mrs. Barbara Chiappone <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street Suite 215 <br />Denver, Colorado 80203-2273 <br />Dear Mrs. Chiappone: <br />Re: Annual Report, B&B Excavating, Inc. <br />Montgomery Pit, MLR No. M-86-104 <br />TAX ID37~ <br /> <br />f~AY 21 1993 <br />~iviSi0!! UI Ivllllbia;t, u ui;~i ~bJ' <br />Mining continued as approved in the original permit applica- <br />tion approved in 1986, our records indicate the annual date for <br />this pit is May 24th, 1993. ~iis pit HAS NOT been granted a <br />Temporary Cessation and it HAS operated more than 180 days this <br />year. Please refer to the Annual Report map for the location of <br />areas discussed in this report. The annual report map reflects the <br />actual areas of disturbance shown on an airphoto we obtained this <br />year. The Financial Warranty for this operation is $14,950, the <br />permitted area is 46.08 ac. ± and the reclamation plan has 3 mining <br />and reclamation phases. A sign that conforms with rule 6.7 Signs and <br />Markers is installed at the entrance to the pit. <br />This information will comply with Section 2.4.1 of the Rules <br />and Regulations. <br />2.4.1 <br />(1) Mining continued in Stage 1 this year, to date we have 4.44 ac. ± <br />partially mined (brown). We are using 4.54 acres ± of the Shop <br />Area in Stage 2 (yellow) as a stockpile area, asphalt plant and <br />concrete plant use area and for equipment storage. The processing <br />equipment is located in Stage 1 at the base of the mine face. <br />Along the south side of the mined area we established the slope <br />from the old ditch setback to the bottom of the pit. The river <br />protection berm along the north side of Stages 1 & 2 is complete <br />where there is a chance the river could be affected. We will <br />continue to extend the berms as mining progresses. These berms are <br />topsoil stockpiles and are shown on the map (gray). The total area <br />disturbed to date remains unchanged from last year at 8.98 acres ±. <br />The CKP Ditch was relocated (Stipulation #1) this year and the <br />plans were approved by the Board on April 21st, 1993, the Spill <br />Prevention plan (Stipulation #2) was submitted. <br />~~a~~~ <br />5 <br />