Laserfiche WebLink
~ ~ ,,*a, <br />March 2. ]982 <br />Valco inc. <br />P.O. Isoz 1340 <br />Pueblo, Colorado 81002 <br />Attn: .lim Griggs <br />Re: File 1177-573 <br />III lllllllllllll III ~ <br />g TaTE C~CC~O~=DJ =,-+'C7 -+.. .., <br />CEPARTMENT OF NATURAL RESGURCES <br />D. Monte Pascoe. Esecub ve Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, t3t3 Sherman Street <br />Denver, Colorado 60203 Tel. 1303) 866-3567 <br />David C. Shelton <br />Director <br /> <br />ADO-~ <br />C K . <br />b .fib S <br /> Dear Afr, Briggs: <br /> Based upon our records, the anniversary date of yo~rr mining operation permit i~ <br /> Plarch 22 and annual fees for the year(s) 7A! $7 , $2 totalling <br /> 5 1,050.00 are due on that date. Fees are based upon a schedule of <br /> 5350.00 if the'oparation is an oven mini no operation o: i0 acres or n, ore and <br /> 5275,00 for any other operation 10 acres or more. <br /> Also, to brino the Dis-ision up to date as to t:~e ,n::nir.g and reclamation on t.`.a <br /> site, p,.ease su,'~m:t a report and map (to a scale of not less than i00' to the <br /> inch and no*_ more than 600` to the inch), indicating the phases of the reclama- <br /> tion plan :/,hich have been completed, correlated ~/it': the timetable. The report <br /> and .rap shall contain the fol2or/i ng information: <br /> Z) Location and nurr~er of acres aifectec? during that year, <br /> 2) Locations and number of acres roc?aimed for that near, <br /> 3) The location and number o_` acres in t!;e variocs stages of reclamation <br /> (backfilied, graded, topsoil replaced, .e!~e^~tatec), <br /> s) T,he species of vegetation planted, the locations and approrimate dates <br /> of planting, <br /> 5) The tupe and aopracimate ouantity of fertilizers, organic material or <br /> soil conditioners used and location of use, <br /> o) An appraisal o: the success of recla.-a ti or. __"orts, and in the Brent <br /> of failure of ape efforts, a short narrar_ic•e on the suspected or determined <br /> causes of such failuz'e, <br /> 7) Estimates e` th~= location and number of ac__*es to ne af_`ected in the <br /> coming gear, and <br /> 9) The effective date of the informat~o^ pro:c<ier: ai~o'.'e shalt 5e no more <br /> than 45 days prior tc the anti versaru date. <br /> <br />