Laserfiche WebLink
-z- <br />Basically, the scope of work included the following: <br />o Installation of two ground water monitoring wells <br />o Performance of field permeability tests in the monitoring wells <br />o Collection and testing of samples of any ground water encountered in the <br />monitoring wells <br />o Sampling and testing of foundation material from the monitoring wells <br />and a test boring located directly beneath the proposed waste rock pile <br />o Re-eva]uation of pre]iminary design recommendations based on the results <br />of this investigation <br />It was originally proposed to include sampling and testing of waste pile <br />material during this phase of the investigation. This proved impossible because <br />no waste pile material is available at this time. <br />CFO-NroaocoNwinr~c iwc <br />