Laserfiche WebLink
1 <br />1 <br />3 <br />-9- <br />o Compaction of waste rock during construction of the pile. <br />o Inspection of the pile by a registered engineer during critical stages <br />of construction. <br />o No subdrainage system. <br />o Installation of an impermeable, non-toxic final cover during reclamation <br />to prevent seepage into the pile. <br />o Monitoring for ground water during construction of the pile. <br />These design recommendations are discussed in more detail in our previous <br />report, which should be used in conjunction with the findings of this current <br />investigation in order to insure a satisfactory design of the pile. <br /> <br />(Denver, July 1 1981 GEO-HYDRO Consulting Inc. <br />Mich al Bukovansky <br />Senior Engineering Geologist <br />7/1QPi~cC ~2~~ <br />Graeme Ma,7or <br />Project Engineer <br />15888 <br />~coHroQOCOHminr~c iNc <br />