Laserfiche WebLink
<br />A-I <br />:Introduction <br />Enclosed is a list of parameters and frequency of monitoring foc the Nucla <br />Strip mine. The preparation of this 11st culminates a review of overburden <br />chemistry data and surface and ground water data contained in the permit <br />application, along with a review of proposed receiving stream standards for <br />the San Higuel River. <br />The mining company is required under Rule 4.05.13(1) and (2) to monitor the <br />effects of surface mining activities on the quantity and quality of water in <br />ground and surface water systems. This monitoring is required to judge the <br />compliance of the operator with the water quality provisions of the Colorado <br />Surface Coal Mining Reclamation Act. The water quality provisions of the Act <br />require that the operator shall in no case violate Federal and State water <br />quality statutes, regulations, standards, or effluent limitations. The <br />water quality standards which the operator must be found in compliance with <br />are Receiving Stream Standards and NPDES effluent (imitations. <br />If representatives of Peabody Coal Company have any comments or questions, <br />please feel free to contact the Division. <br />• <br /> <br />A-2 <br />