Laserfiche WebLink
Frequency Over what period <br /> c. Watering <br /> V. Evaluation of success <br /> a. What areas need additional backfilling? <br /> The balance of the pit. <br /> b. Mat areas need additional shaping? <br /> The balance of the pit. <br /> c. What areas need additional planting? <br /> The balance of the pit. <br /> VI. Plan for the following year <br /> Permit Previous Report <br /> a. Mining Current plan Specification Projection <br /> 1. # Acres to be <br /> stripped <br /> Locations none <br /> 2. $ Acres to be <br /> excavated 11 . 0 <br /> Locations north end of pit <br /> b. Reclamation <br /> 1. # Acres to be <br /> backfilled none <br /> Locations <br /> 1 <br /> . h <br /> 2. 1 Acres to be <br /> graded none I <br /> Locations <br />