Laserfiche WebLink
STATUS OF 1 WI AND RDQAMATION <br /> I <br /> Pit Name: Nelson Pit <br /> Operator: Flatiron Paving Company <br /> Manager: Wayne Sailer <br /> Date: May, 1982 Reporting Period: May 1 , 1981 to May 82 <br /> A. Please provide a brief narrative of your reclamation efforts in the past 12 months <br /> Specifically we are interested in what you have and have not accomplished in this <br /> area and an explanation of the problems involved and the successful methods you've <br /> used. <br /> 1 . Re-sloped the pit banks on east and .north side. <br /> 2. Built the spillway on north end. <br /> 3. Placed topsoil on finished slopes . <br /> 4 . Placed rip rap on spillway. <br /> 5 . Installed overflow pipe (24" ) . <br /> B. In order to supply detail for your evaluation, please fill in the blanks below. <br /> i <br /> I. Mining Permit Annual Report <br /> Actual Specification Projection <br /> a. # Acres Stripped <br /> Locations none <br /> b. # Acres Excavated <br /> Locations none <br /> c. # Acres available for 8 .00 <br /> reclamation <br /> Locations NE part of pit <br />