My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP47319
DRMS
>
Back File Migration
>
Report
>
REP47319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:50:52 AM
Creation date
11/27/2007 11:58:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Report
Doc Date
10/6/2006
Doc Name
3rd Quarter 2006 Waste Bank Inspections
From
J.E. Stover & Associates Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM MINING, LLC <br />Munger Canyon Mine <br />Coal Mine Waste Bank Inspection -3`d Quarter 2006 <br />On September 13, 2006, I performed the required quarterly visual inspection of the <br />Munger Canyon Mine coal mine waste bank in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The gob disposal area was dry. Previous inspections <br />by the undersigned noted that all organic material and topsoil has been removed ahead of <br />the waste bank founding. The upper diversion ditch was inspected with no problems <br />noted. <br />The first coal mine waste, 1,270 tons, were placed in the pile during the period November <br />23`d through November 29, 2004. The coal mine waste was leveled during the second <br />quarter 2005. Approximately 880 cubic yards were hauled to the gob pile and compacted <br />during April 2006. No material was hauled to the gob pile during the quarter. <br />Coal mine waste is to be placed in the pile in approximately horizontal lifts no more than <br />24-inches thick. The coal mine waste is spread and compactive effort is provided by a <br />front-end loader. No compaction tests were taken during the period. A test passes if the <br />test attains at least 90% of the maximum dry density attained in a laboratory compaction <br />test in accordance with ASTM D698. <br />A failure of the pile would probably not be a hazard to human life. The pile is located in a <br />remote area well away from human habitation. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Munger Canyon Mine refuse pile have been constr~~f~~sjmitted in the design <br />approved by the DMG. ~~p~P•°••°'°S SrF,Q o <br />oS F <br />~~~a g~ .~~.e~O~ <br />Recommended maintenance: None ,!~;Q 5~~°n*; <br />"i_ v <br />~titr; L~`.''. 0 <br />t i ~ .1 o_ <br />"onal Engineer <br />19230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.