Laserfiche WebLink
1.0 INTRODUCTION <br />~ This report is submitted to the Office of Mined Land Reclamation (OMLR), Division of Minerals and <br />Geology, in fulfillment of the requirements outlined in Section 2.04.7 of permit C-81-008. This <br />report presents the data and analysis resulting from the hydrologic monitoring program for the period <br />October 1, 1992 through September 30, 1993. <br />During this monitoring period, the New Horizon Mine status changed from temporary cessation to <br />an active operation. Construction of the New Horizon 2 Mine was completed and mining activity has <br />' begun. Activities at the New Horizon 1 Mine were all related to reclamation and monitoring. <br />The Hydrology Monitoring Site Location Map is included with this report as Plate 1. This is also Map <br />2.04.7-1 from permit C-81-008. <br /> <br />