Laserfiche WebLink
5.0 PROBABLE HYDROLOGIC <br />As noted in Table 2.05.8.(3)-t of the New Horizon mining permit (C-8t-008), all of the expected <br />impacts to the hydrologic system at New Horizon are of little or negligible significance. During this <br />monitoring period no unforeseen or unusual hydrologic consequences were discovered. <br />12 <br />