Laserfiche WebLink
Interim Reseeding <br />Spring 1998 (April 1998 to May 1998) <br />Svlvester Gulch Facilities <br />1. Live Subsoil Stockpile #i 1.72 Acres <br />2. Area South of Sylvester Gulch Fan 0.50 Acres <br />3. Live Subsoil Stockpile #2 0.51 Acres <br />4. Topsoil Pile #1 2.06 Acres <br />5. Sylvester Gulch South of F-Wall 0.80 Acres <br />6. Shaft #1 and #2 Topsail Pile 4.00 Acres <br />7. Overflow Collector Channel 3.30 Acres <br />8. Detention Pond Area 2.34 Acres <br />9. Intake Shaft #3 Cut-banks 1.14 Acres <br />10. Degas Borehole Light-use Road Cut-banks & Fill Banks 0.11 Acres <br />11. Topsoil Stockpile #5 1.72 Acres <br />18.20 Acres <br />West Elk Mine Facilities <br />1. Material Storage Bench Cut-slope 4.80 Acres <br />4.80 Acres <br />Spring 1998 Total Acres 23.00 <br />Fall 1998 (September 1998 to December 1998) <br />Svlvester Gulch Facilities <br />1. Dewatering Borehole Pad Topsoil Stockpile and Ditch 2.0 Acres <br />2. Dewatering Borehole Polishing Pond Perimeter/Pipeline 2.0 Acres <br />3. Ventilation Facility Site -Topsoil Pile 4.0 acres <br />4. Sylvester Gulch Road Cut-slopes 2.0 Acres <br />5. Failed-Fill 4.0 Acres <br />14.0 Acres <br />West Elk Mine Facilities <br />1. North Soils Storage Area -West Topsoil Pile 4.0 Acres <br />2. Lower Refuse Pile -East, North, and West Slopes 2.5 Acres <br />3. Run-of Mine Expansion Fill Slopes 2.0 Acres <br />4. Trench Drains 5.0 Acres <br />13.5 Acres <br />Fall 1998 Total Acres 27.5 <br />Total Re-seeded Acres 1998 50.5 <br />