Laserfiche WebLink
<br />~ombct~t~ vita ~,o,ooci~tc~ <br />CONSULTING GEOTECH NICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER M93121MT DATE Wednesday 12-8-93 <br />PROJECT NAME West Elk Mine <br />PROJECT LOCATION Somerset, Colorado <br />CLIENT West Elk Mine <br />CONTRACTOR West Elk Mine <br />TECHNICIAN Hayes <br />W EATIIER CONDITIONS Clear <br />WORK REQUESTED Density Tests <br />FOREMAN Mr. Henry Barbe <br />WORK PERPO Rh1ED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 10:00 A. M. as requested by Mr. Henry <br />Barbe. I performed coal gob density tests as requested by Mr. Barbe of mat <br />material being placed on the lower refuse pile using nuclear soil density <br />test methods. Please refer to the test results sheet for approximate test <br />locations and test results. The test results were verbally given to Mr. Barbe <br />at the time of our site visit. The test locations were determined by Mr. Barbe. <br />The test results indicate only the relative compaction and soil moisture content <br />of the material tested at the elevation and location tested at the time of our <br />site visit. <br />A Proctor sample was also picked up and returned to the laboratory on this <br />date. <br />P.O. BOX 3986 P O. RO%0045 463 TURNER, 104A <br />GRAND JUNCTION, CO 61502 MUNTROSE. CO 61402 DURANGO. CO 61301 <br />(303) 2456506 (303) 2d9~215d (303) 259-5095 <br />