My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-03-29_REPORT - M1977568
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977568
>
2000-03-29_REPORT - M1977568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2021 4:26:14 PM
Creation date
11/27/2007 11:38:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977568
IBM Index Class Name
Report
Doc Date
3/29/2000
Doc Name
Annual Fee/Report/Map
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL REPORT , <br /> INSTRUCTIONS <br /> According to C.R.S. 34-32-1 160), and C.R.S. 34-32.5-1 16(3)(a), on the anniversary date of the permit each }'ear, <br /> the operator shall submit a report and a map showing the extent of current disturbances to affected land, <br /> reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br /> during the upcoming year. and reclamation that will be performed during the upcoming year. Please attach such <br /> a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br /> the above elements may suffice for a written report.) <br /> If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br /> provide with the Annual Report the following information as required by '_ CCR 407-1. 407-4, and Rules <br /> 1.13.7(1)(a): <br /> (i) the condition of the operation at the time of cessation: <br /> (ii) what specific measures have been and will be implemented to comply with reclamation- performance <br /> standards and Environmental Protection Plan requirements, if they are part of your approved application: and <br /> (iii) plans for resumption of mining operations. <br /> Please provide the additional following information with your Annual Report, as applicable: <br /> (a) Per the requirements of 2 CCR 407-1. 407-4, and Rules 1.15(1), provide an updated statement <br /> regarding the sufficiency of the value of the Financial Warranty, specifically: <br /> (i) Per the requirements of 2 CCR 407-1, 407-4. and Rules 1.1 5(1)(a). provide an updated <br /> statement regarding the sufficiency of the value of the financial warranty. Specifically, <br /> irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br /> credit, and first priority liens on project related fixtures. <br /> (it) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(b), permits secured with a <br /> Deed of Trust or a Security Agreement, the operator shall submit an update. by a qualified <br /> independent appraiser, indicating any changes in property value, and a statement summarizing <br /> anv circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br /> and the value of the property subject to either of these instruments. The report shall also provide <br /> proof that there are no past-due property taxes. <br /> (i) Per the requirements of 2 CCR 407-1. 407-4, and Rules 4.7(3). permits secured with an <br /> Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br /> of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br /> Credit does not exceed ten percent (109c) of the bank's capital surplus accounts. <br /> (it) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br /> Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br /> detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br /> (b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br /> required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br /> note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br /> Plan as part of your approved pennit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.