My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46967
DRMS
>
Back File Migration
>
Report
>
REP46967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:50:23 AM
Creation date
11/27/2007 11:36:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
6/15/1999
Doc Name
1998 AHR LIST OF TABLES TO TABLE 29
Annual Report Year
1998
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TABLE 1 (Continued) <br />HYDROLOGIC MONITORING SITES <br />SURFACE WATER SITES <br />S[TE MONITORING FREQUENCY COMMENTS <br />Water Level or W:ucr Qualih <br />Fluty S FieIJ Sampling <br />Parameters <br />Foidel Creek <br />USGS 09243800 Monthly Quarterly (1) & (2) <br />14 Monthly Quarterly (3) <br />8 Monthly Quarterly (1) & (2) <br />USGS 09243900 Monthly Quarterly (2} <br />Middle Creek <br />USGS 09243700 Monthly Quarterly (2) <br />Fish Creek <br />16 Monthly Quarterly (1) & (2) <br />302 Monthly Monthly During irrigation <br />• season only; (1) & (4) <br />1002 Monthly Quarterly (1) & (2) <br />Trout Creek <br />301 Monthly Monthly During irrigation <br />season only; (I) .\ (a) <br />69 Monthly Monthly Durin;; irri~atiuu <br />season unl1; U) ~ (J) <br />NOTES: <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. If site is removed from <br />TCC's program and continued monitoring is required, CYCC will monitor site. <br />(2) Sampling will be performed on a ileLble schedule throughout normal ilow period, March through <br />September. Within this time frame, ilow and field parameters will be measured twelve times and four <br />ftdl suite analyses will be conducted. <br />(3) Monthly field samples when Bowing; Four month)}' lab samples obtained once runoff begins. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dcwetering Facility is functioning. <br />• <br />I ~ENViN 4'IFONMENT.LL4VIR49?B~CYCC XIs <br />
The URL can be used to link to this page
Your browser does not support the video tag.