Laserfiche WebLink
<br />TABLE l (Continued) <br />HYDROLOGIC MONITORING SITES <br />WATER LEVEL MEASUREMENTS <br />SITE MONPCORING FREQUENCY COMMENTS <br />Water Level Only <br />Foidcl Creek <br />la monthly (1), (2) & (3) <br />8 Monthly (1), (2) & (3) <br />304 Monthly (1), (2) & (3) <br />Foidel Creek Alluvium <br />16 Monthly (1), (2) & (3) <br />302 Monthly (During Irrigation) (1) & (4) <br />307 Mootbly (1), (2) & (3) <br />1002 Moathly (1), (2) & (3) <br />NOTES: <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. 11'sitc is removed from <br />TCC's program and continued monitoring is require J, CYCC will monitor xite. <br />(2) Monthly measurements for water level collected during ice free months: late March or rely April <br />• through September. <br />(3) These sites are also components of surface stream flow monitoring program. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dewatering Facility is functionieg. <br />• <br />I ~EN~ENVIRONT¢NTALWIR\1998\CYCC );LS <br />