Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 2 Mine <br />2001 Annual Hydrology Report <br />• 534-24 Hubbard Creek -Spring 34-24 <br />Surface Water <br />6/2/1998 to Present <br />Elev. 6390 Baseline <br />~ Field Pararrieters <br />,:. ,, <br />.........:............................ e6/16rot a613oro1 osnarol 1o13oro1 Min Max Avg <br /> Flow Rate (gpm) o.o o.o o.o o.o o.o o.v a.r <br /> Water level c=r p=y o=r v=r <br /> pH (Standard Units) ra ra rs <br /> Conductivity (umhos/cm) Toro fora mio <br /> Temperature (C) re.o re.o rv.o <br /> ......................................................................... <br />Lab Parartte#ers <br />i:~ >~: ~ _;;; <br />There Iz no lab analysis for <br /> <br />There Is no lab analysts for this point due to low flows or this point Due to low gown <br /> Wet Chemistry MDL Iowwaterlevelduringthispertodorasnatedabove Pewoad[erlevel4vdngthis <br /> Alkalinity as CaCO (mg/q <br /> Bicarbonate as CaCO (mg/1) z <br /> Carbonate as CaCO (mg/I) z <br /> Hydroxide as CaCO (mg/I) ~ z <br /> Chloride (mgA) ~ <br /> Conductivity (umhos/cm) i <br /> Nitrate (mg/I) o. oz <br /> Nitmte/Nitrite as N, dis. (mg/I) o.oz <br /> Nitrite as N, dissolved (mg/I) o. of <br /> pH (Lab Units) o. i <br /> Hardness (mgll) 1 <br /> Phosphate (mgA) 0.03 <br /> Phosphorous, ortho dis. (mgA) o. oos <br /> TDS X180 C (mgA) io <br />. TSS (mg/I) s <br /> SAR o.03 <br /> Sulfate (mg/I) tc <br /> Metals <br /> Aluminum, total rec. (mgA) 0.03 <br /> Arsenic, total recoverable (mgA) g. 001 <br /> Cadmium, total recoverable (mg/I) o. 003 <br /> Calcium, total recoverable (mg/I) o. z <br /> Copper, total recoverable (mgA) o. z <br /> Iron, total recoverable (mg/I) o. 01 <br /> Lead, total recoverable (mgA) o. oa <br /> Magnesium, total rec. (mgA) o.z <br /> Manganese, total rec. (mgA) o.z <br /> Mercury, total rec. (mgA) 0.0002 <br /> Molybdenum, total rec. (mg/I) o. of <br /> Selenium, dissolved (mg/l) o. ooi ~ <br /> Sodium, dissolved (mg/p o.3 <br /> Zinc, dissolved (mgll) o. of <br /> Organic Analysis <br /> Oil and Grease, total rec. (mg/I) z , <br />Required by current permit. <br />Operational <br />Baseline Information Collection initiated on 6/2/1998 and not yet considered complete after monkodng for-43 months. Point 534-24 has nor been inguenced by mining. <br />The monitoring point rot 534-24 (Spring 3424) is found along the Hubbard Creek Trial. It is a diverse flow along the upper edge of the trail. <br />MDL=Method Determination Limit BLANK=Not Tested Monitoring Point Table 38 <br />