My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-04-08_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2004-04-08_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:00:50 PM
Creation date
11/27/2007 11:28:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
4/8/2004
Doc Name
2004 Annual Report
From
Cripple Creek & Victor Gold
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C ~ Cripple Creek & Victor Gold Mining Company <br />SENT CERTIFIED, RETURN RECEIPT REQUESTED <br />7002-2410-0002-6718-5667 <br />~ T A Joini Venture - ANGLOGOLD (COLORADO) CORP., Manager <br />V Operations Office <br />l~l7XX~... P.O. Box 19'I • 100 North 3rd Street <br />Victor, Colorado 80860 <br />(719) 689-2977 • Fax (7'19) 689-3254 <br />April 7, 2004 <br />Mr. Berhan Keffelew <br />Sr. Environmental Protection Specialist <br />Office of Mined land Reclamation <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />~~~.~~~~ <br />APR Q 0 2004 <br />tlipislon of Minerals anG Gzalagy <br />RE: Cresson Project. Permit M-1980-244 Annual Reoort and Fee <br />Dear Mr. Keffelew: <br />Enclosed please find the annual report form, annual fee of $1,000.00 (check no. 00068125), <br />and map for Cripple Creek 8r Victor Gold Mining Company's ("CC&V") Cresson Project, Permit <br />M-1980-244. This report covers the time period between April 1, 2003 and March 31, 2004. <br />Reportable Conditions: <br />Amendment No. 8 site preparation and development activities continued in the Main Cresson <br />and East Cresson Mine areas. Construction of Phase IVb of the Valley Leach Facility ("VLF") <br />was completed in 2003. Phase IVc construction will continue in 2004. Enhancement of <br />stormwater control features continued in 2003. Remaining Amendment No. 8 activities will <br />continue throughout 2004 and beyond. <br />CC&V implemented reclamation techniques on approximately 50.5 acres of land during the <br />reporting period. The majority of this reclamation consisted of re-seeding acreage <br />(maintenance), which had shown limited revegeation due to drought conditions during the 2002 <br />growing season. Approximately 3.5 of the 50.5 acres (portions of the South Haul Road) <br />received initial reclamation. The areas receiving initial or maintenance efforts in 2003 consisted <br />of development rock removal areas, Highway 67 realignment and related disturbances within <br />the permit boundary, VLF pumpback facility, storm water structures, and portions of the South <br />Haul Road. In addition, backfilling of the Portland surface mine began in January 2004 and will <br />continue in 2004. <br />Per the requirements of C.R.S. 3~5-32-116(3), and C.R.S. 34-32.5-116(3)(a): <br />'~ <br />Reclamation accomplished to date: Approximately 215.5 acres <br />Reclamation accomplished during the preceding year Approximately 50.5 acres total in 2003 <br />(consisting of 3.5 acres of initial seeding and 47 acres of maintenance seeding) <br />
The URL can be used to link to this page
Your browser does not support the video tag.