Laserfiche WebLink
Proposed 1991 Monitoring <br />~ With the reclamation phase of the mine now complete, surface water monitoring of water <br />quantity will continue on a quarterly frequenry and water quality sampling will continue on <br />' a semiannual frequency with the same parameters. NPDES sampling and monitoring will <br />be continued as required by that permit. <br />